Methodology

Visible assumptions, replaceable evidence.

The model starts with separately sourced 2026 bands for installation, tank-only, drain-field, full-system and pumping work. System type is built into the applicable project band; smaller visible adjustments then show how capacity, soil and access can move a project. It rounds the output to planning figures and never selects a legally suitable system.

How the model works

  1. Project types keep tank-only, drain-field, full-system and pumping work separate.
  2. Conventional, chamber, aerobic, mound and sand-filter work do not share one artificial starting price.
  3. Bedrooms act only as a planning proxy for likely capacity.
  4. Soil and access adjustments are visible rather than hidden in a ZIP-code claim.
  5. Local design, testing and permits override the national model.

What the result means

The low and high values are planning bounds. The midpoint is simple arithmetic, not a prediction of the most likely contractor or carrier price. The calculator cannot inspect a property, verify a shipment, choose a legally suitable system, reserve capacity or issue a quotation.

Review date: 14 September 2026. We change a model only when the source, calculation and reason for the change can be recorded.

Current evidence snapshot

These are source observations used to bound a national planning model. They are not additive line items, a local price list or a prediction for a particular property.

Source register

Error corrections

If a source is outdated or a calculation does not behave as described, email [email protected] and identify the URL, input and expected result. Do not include private customer or property information.