Methodology

Visible assumptions, replaceable evidence.

The model starts with separately sourced 2026 bands for installation, diagnosed repair, tank-only, drain-field, full-system, pumping, tank locating and perc-test or soil-evaluation work. System type is built into the applicable project band; smaller visible adjustments then show how capacity, soil and access can move a project. It rounds the output to planning figures and never diagnoses a fault or selects a legally suitable system.

How the model works

  1. Project types keep diagnosed repair, tank-only, drain-field, full-system, pumping, locating and site-evaluation work separate.
  2. Conventional, chamber, aerobic, mound and sand-filter work do not share one artificial starting price.
  3. Bedrooms act only as a planning proxy for likely installation capacity.
  4. Soil and access adjustments are visible rather than hidden in a ZIP-code claim.
  5. Local diagnosis, design, testing and permits override the national model.

What the result means

The low and high values are planning bounds. The midpoint is simple arithmetic, not a prediction of the most likely contractor or carrier price. The calculator cannot inspect a property, verify a shipment, choose a legally suitable system, reserve capacity or issue a quotation.

Review date: 14 September 2026. We change a model only when the source, calculation and reason for the change can be recorded.

Current evidence snapshot

These are source observations used to bound a national planning model. They are not additive line items, a local price list or a prediction for a particular property.

Source register

Error corrections

If a source is outdated or a calculation does not behave as described, email [email protected] and identify the URL, input and expected result. Do not include private customer or property information.